PARAMETRO |
VALOR |
VARIALBLE |
|
|
|
|
|
|
|
|
|
|
Pasante Harnero Sec 1 |
0,6 |
XX200 |
|
Pasante Harnero Sec 2 |
0,6 |
XX201 |
|
Pasante Harnero Terc 1 |
0,6 |
XX202 |
|
Pasante Harnero Terc 2 |
0,6 |
XX203 |
|
Capacidad Chancador Primario |
1000.0 |
XX300 |
|
Capacidad Acopio Mineral Grueso |
20000.0 |
XX2059 |
|
Capacidad inicial Ch Primario |
225.0 |
SS200 |
|
Capacidad Inicial Acopio M
Grueso |
10000.0 |
SS208 |
|
|
1.0 |
XX3366 |
|
|
1.0 |
XX3367 |
|
|
0.4 |
XX3368 |
|
|
1000.0 |
XX3369 |
|
|
18000.0 |
XX2060 |
|
|
10000.0 |
XX2061 |
|
|
5000.0 |
XX2062 |
|
|
1.0 |
LL3061 |
|
|
1.0 |
LL3062 |
|
Dimensión Pilas |
|
|
|
Largo Pila
(m) |
1166,4 |
XX44 |
|
775 |
|
Alto Pila
Estandar (m) |
4.0 |
XX45 |
|
Largo Módulo
(m) |
21,6 |
XX55 |
|
Ancho Módulo
(m) |
350.0 |
XX46 |
|
Densidad
Mineral Estandar T/M3 |
1,4 |
XX42 |
|
Distancia
costado Pila al eje entre Pilas (m) |
20.0 |
XX106 |
|
Ancho
Botadero (m) |
400.0 |
XX105 |
|
Largo
Botadero (m) |
2000.0 |
XX284 |
|
Avance Correa
Apiladora (m) |
0,9 |
XX108 |
|
Avance Correa
Recuperadora (m) |
0,9 |
XX109 |
|
Densidad
Ripio t/m3 |
1,8 |
XX43 |
|
Humedad
Mineral ·% |
0,11 |
Hini |
|
lts/h |
|
Pext t |
29.240 |
|
Flujos de
Regadìo (lts/m2 /hr) |
|
|
Sup |
7560 |
|
Pext t+1 |
29.330 |
|
Flujo
Impregnación 1 |
4.0 |
xx59 |
|
30240 |
|
Pexr en Deltat |
0.001 |
|
30240 |
181440 |
|
Flujo
Impregnación 2 |
4.0 |
xx60 |
|
30240 |
|
|
|
362880 |
|
Flujo
Impregnación 3 |
4.0 |
xx61 |
|
30240 |
|
tons tot |
31,752.000 |
|
181440 |
544320 |
|
Flujo
Lixiviación |
4.0 |
xx62 |
|
30240 |
|
leyMin |
0.013 |
|
725760 |
|
Flujo Lavado |
4.0 |
xx63 |
|
30240 |
|
porc modulo |
0.250 |
|
flujo de
Evaporaciòn |
0.01 |
|
75.6 |
|
|
|
flujo salida
minima capilaridad |
0.10 |
680.4 |
|
756 |
|
CuDisp |
103.194 |
|
|
|
|
CuExtr en deltat |
0.093 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
189000 |
|
|
Duraciòn Giro Correas (Hrs) |
14.0 |
|
|
|
|
Variaciòn + - |
2.0 |
|
|
|
|
|
|
|
|
|
|
Cinética de Extracción A*(1-exp(-b*t)) |
|
|
|
|
|
Porcentaje max Extracción (A) |
81.0 |
73.2 |
|
|
|
Velocidad diaria de extracción |
0.040 |
0.0540 |
0,040 |
0.055 |
|
|
|
|
|
|
|
|
|
Tasa Chancador Primario |
2100.0 |
|
|
Tasa Descarga Buzòn Chancador Primario |
2100.0 |
|
|
720 |
|
Tasa descarga Alimentador Mineral Grueso 1 |
350.0 |
|
|
Tasa descarga Alimentador Mineral Grueso 2 |
350.0 |
|
|
Tasa descarga Alimentador Mineral Grueso 3 |
350.0 |
|
|
Tasa descarga Alimentador Mineral Grueso 4 |
350.0 |
|
|
Tasa descarga Alimentador Mineral Grueso 5 |
350.0 |
|
|
Tasa descarga Alimentador Mineral Grueso 6 |
350.0 |
|
|
Descarga Tolva Alimentaciòn Harnero
Terciario 1 |
1050.0 |
|
|
Descarga Tolva Alimentaciòn Harnero
Terciario 2 |
1050.0 |
|
|
Descarga Tolva alimentador Chancador
terciario 1 |
525.0 |
|
|
Descarga Tolva alimentador Chancador
terciario 2 |
525.0 |
|
|
Descarga Silo Min fino 1 |
700.0 |
|
|
Descarga Silo Min fino 2 |
700.0 |
|
|
Descarga Silo Min fino 3 |
700.0 |
|
|
Tasa Excavaciòn Rotopala |
2300.0 |
|
|
Harnero Chancado Terciario |
|
|
|
Fracción Pasante (1.0 No hay Harneo) |
1.0 |
|
|
|
|
Mes de simulaciòn |
Dias pre mes |
|
Tiempo de simulaciòn (Dìas) |
|
10 |
5 |
|
SBL
Ley / Modulos equivalentes |
|
0.18 |
300 |
|
1260 |
|
xx3323 |
|
1 |
|
|
|
Ley |
Coef A |
|
Ley Enero |
|
1.11 |
81 |
|
3 |
|
Ley Feb |
|
1.11 |
81 |
|
Mar |
|
1.11 |
81 |
|
Abr |
|
1.11 |
81 |
|
May |
|
1.11 |
81 |
|
Jun |
|
1.11 |
81 |
|
mts2 |
7560 |
30240 |
362880 |
|
Jul |
|
1.11 |
81 |
|
Ago |
|
1.11 |
81 |
|
Sep |
|
1.11 |
81 |
|
Oct |
|
1.11 |
81 |
|
|
Durac dìas |
Flujo lts/hr-mt2 |
dur reg |
cons diario |
Cons fase |
Nov |
|
1.11 |
81 |
|
Impreg1 |
5 |
4 |
2 |
60,480 |
302,400 |
Dic |
|
1.11 |
81 |
|
Impreg2 |
5 |
4 |
8 |
241,920 |
1,209,600 |
Ley Enero |
|
1.11 |
81 |
|
Impreg3 |
5 |
4 |
12 |
362,880 |
1,814,400 |
Ley Feb |
|
1.11 |
81 |
|
Lixiv |
80 |
4 |
18 |
544,320 |
43,545,600 |
Mar |
|
1.11 |
81 |
|
Drenaje |
6 |
4 |
0 |
0 |
0 |
Abr |
|
1.11 |
81 |
|
May |
|
1.11 |
81 |
|
Jun |
|
1.11 |
81 |
|
|
|
1.11 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Niveles Control Tolvas |
|
|
|
Nivel Máx Tolva |
600.0 |
xx3213 |
|
Nivel Máx para reiniciar alimentación |
480.0 |
xx3212 |
|
Nivel Min para reiniciar descarga |
180.0 |
XX3211 |
|
Nivel Mìnimo para descargar |
80.0 |
XX3210 |
|
|
|
|
Duraciòn ciclos
impregnaciones |
|
|
Regadìo 1a Impregnación |
2.0 |
XX4013 |
|
Reposo 1a Impregnación |
6.0 |
XX4014 |
|
Regadìo 2a Impregnación |
4.0 |
XX4015 |
|
Reposo 2a Impregnación |
4.0 |
XX4016 |
|
Regadìo 3a Impregnación |
6.0 |
XX4017 |
|
Reposo 3a Impregnación |
2.0 |
XX4018 |
|
Regadìo Lixiviación |
24.0 |
XX4019 |
|
Reposo Lixiviación |
0.0 |
XX4020 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ajuste tamaño mòdulo |
1.25 |
|
Duraciòn Ciclo de Lixiviaciòn
(dìas) |
|
|
|
1. Carga |
Variable |
|
Duraciòn estàndar 4 mts altura |
|
2. Aramado |
0.6 |
XX4007 |
|
0.5 |
|
3, Reposo |
Variable |
|
4, Impregnación1 |
2.5 |
XX4008 |
1 |
3 |
2 |
|
5. Impregnación2 |
2.5 |
XX4009 |
1 |
4 |
2 |
|
6. Impregnación3 |
2.5 |
XX4010 |
2 |
4 |
2 |
|
7. Lixiviación1 |
56.3 |
XX4011 |
|
45.0 |
|
8. Lixiviación2 |
56.3 |
XX4012 |
|
45.0 |
|
9. Lavado |
2.5 |
XX4029 |
|
2.0 |
|
10. Drenaje |
3.8 |
XX4030 |
|
3.0 |
|
11. Para excavar |
Variable |
|
|
12, Excavando |
Variable |
|
|
13. Vacìo |
Variable |
|
|
|
|
|
|
|
Coef Transferencia E1 |
|
0.8 |
|
Coef ransferencia S1 |
|
0.8 |
|
% Desc SX XX(4126) |
|
0.288 |
|
Tini(0) |
|
200 |
|
Conc inicial regadìo gr/lt |
|
1 |
|
Con inicial Orgànico
desgastado |
|
3.5 |
|
Flujo inicial Spent lts/hr |
|
169.642857 |
|
Conc inicial Spent |
|
37 |
|
Con inicial entrada Scav |
|
51 |
|
Flujo entrada S1 Organico
cargado |
|
4075000 |
|
Conc entrada S1 |
|
17.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|